August 23, 2019

Grading is great - overgrading is not

Grading layers

Getting the most out ofwhat you’ve got

Grading is all about getting the most out of the all-important bulk catalyst in your reactor setup. The right grading configuration is the most effective “preventive measure” and the ultimate adjustment knob.

这是一个余额问题,利用您使用的批量催化剂的全部有效性,并使用评分来保护其免受导致成本高昂的污染和堵塞pressure dropor premature catalyst deactivation.

Too little grading – not enough protection

如果您不加载足够的分级(具有正确的规格和配置),您将无法过滤掉原料中的所有讨厌的东西 - 并且您的散装催化剂将迅速受到污染。

不足和/或无效的分级,您可能最终可能会履行昂贵的关闭waytoo soon.

Too much grading – not enough benefit from your bulk catalyst

Conversely, with the kinds of feedstocks that many refineries now have to deal with, e.g. renewable feedstocks or opportunity crudes, featuring large amounts of contaminants difficult to deal with, we see a growing tendency to use more and more grading as a protective measure.

But if you usetoo muchgrading, you’ll end up missing out on the full potential of the unit, as the excess grading material takes up the space from the bulk catalyst.

Your grading load should help you:

  • Provide a stepwise increase in activity to control the hydrogenation of more reactive components present in the feed
  • Make sure all feedstock contaminants are removed
  • 确保从上游设备中取出任何腐蚀产品乐动体育电竞
  • Control exotherm
  • Prevent catalyst milling
  • 防止地壳的形成
  • Prevent pressure drop problems

Finding the right balance for your exact needs

If you are processing an easy straight run and there are no obvious corrosion issues, there is no reason for grading material to take up space that you can put to better use for the workhorse in your reactor – the bulk catalyst.

Optimized grading

In order to get the maximum cycle length out of your catalyst loading, the right balance between bulk catalyst and grading is crucial. If too little grading is loaded, the cycle will be shortened by premature catalyst poisoning or too high pressure drop (top). If too much grading is loaded, the unit will be limited by activity of the bulk catalyst before the grading capacity has been fully utilized (middle). With the right balance, you obtain the optimal (bottom).

It’s all a question of balancing the specifics of your operation’s particular feedstocks, budgets, practical challenges, and operating profiles. Our aim is to enable you to maximize catalyst cycle length and make sure the pressure drop across your reactor doesn’t limit throughput until the activity of the bulk catalysts has reached the scheduled End-Of-Run (EOR).

ARTICLE Avoiding unplanned reactor shutdowns

全方位的专业知识

It takes considerable specialist know-how to determine确切地每次加载需要多少等级,以及如何平衡所有不同的要求和考虑因素。

我们可能是唯一可以为您提供全部谱的专业知识,设备解决方案的公司分级和散装催化剂产品,因此可以为您提供无偏见的建议。乐动体育电竞我们从经验中知道这可以 - 不幸的是 - 如果您从不同供应商提供评分和批量催化剂,难以获得。

当分级不够

If the quantities of contaminants in the feedstock require a substantial grading load to filter them out, the grading can end up taking up too much of the limited space inside your reactor. But you can easily tackle situations like this by installing Topsoe scale catcher systems above the catalyst itself.

Haldor Topsoe pressure drop control process offering

话题): Refinery,catalyst,grading